Prepared for
Job
| Materials | Qty | Unit | Amount |
|---|
Terms
Prepared with Takeoff Kit · takeoffkit.co
Prototype · v0.3 · paint, concrete and pricing defaults calibrated; the rest are starter guesses
Material takeoffs and a running estimate for handyman jobs. Figure the job, add each line to the estimate, send the customer a number.
Wall area from room dimensions, minus openings. Coverage defaults to 250 sq ft per gallon, a real-world number, not the 400 on the can.
Sheets, mud, tape and screws for a room or a patch. Waste defaults to 10 percent.
Boxes to buy from room size, pattern waste and the coverage printed on the box.
Cubic yards for a ready-mix order, or bag count for mixing on site.
Decking run perpendicular to joists. Board count assumes boards run the length of the deck.
Posts, rails, pickets and post concrete for a straight run. Add gates separately.
| Materials | Qty | Unit | Amount |
|---|
Prepared with Takeoff Kit · takeoffkit.co
Accounts are being switched on. Everything on this page works without one; your numbers are remembered on this device.
Free to create. An account by itself changes nothing; Pro is what saves your numbers across devices.
Signed in as
PNG or JPEG. It's shrunk to fit and stored with your account.